Carriageway & Footpath Repairs
Work included:
Lift, clean and relay sunken block paving.
Lift, clean & relay sunken PCC slabs.
Break out & relay defective Marshalls Conservation Kerbs.
Relay coping stones.
Lift & re-set ironwork to correct levels.
Saw cut, break out defective areas of asphalt and relay surface course material, by hand.
Import, grade and compact dust to re-dress granular footpaths.
Brush kiln dried sand into paved areas, to lock blocks into position.
Info:
|
Duration: |
12 Weeks |
|
Client: |
VIVO Defence Services |
|
Value: |
£171,000.00 |
Innovation:
A key innovation within the project was the adoption of a sustainable repair methodology focused on retaining, reconditioning, and relaying existing paving materials wherever possible, reducing waste generation while preserving the visual character of the public realm.