Cycle Storage Hub
Work included:
GPR, Utility and Topographical Surveys.
Full project design, including lighting.
Site clearance & excavation to formation.
Erection of timber formwork.
Installation of steel fabric mesh and cut and bent reinforcing bar. Pump and finish 2 large concrete slabs.
Installation of two galvanized steel cycle storage hubs with two tier rack system.
Hard and soft landscaping to the surrounding areas, including a link footpath network, with pedestrian crossing points and powder coated handrails.
Info:
Dates: |
30 Weeks 2020-2021 |
Client: |
Amey Defence Services |
Value: |
£480,000.00 |
Innovation:
The end user required an increase in cycle storage, outside of the inner zone fence line. Benchmark were tasked with surveying the site to locate and identify suitable areas and then produce a design fitting of those areas to meet the new storage requirements.
Customer Satisfaction:
"Our client is extremely happy with the new facilities. Well done" – Amey Senior Project Manager