Fire Escape Improvements
Work included:
Undertake a GPR Survey & record the results of the survey.
Excavation of existing path materials, including granular dust and sub-base.
Installation of PCC edgings.
Replacement of defective manhole covers & adjustment of other covers & frames.
Laying of imported Type 3 sub-base to enable drainage percolation.
Handlay AC10 open graded permeable bitumen macadam.
Install 18mm depth of Sureset permeable resin bound material in 6mm Mahogany.
Compaction using a Power float for an improved finish.
Investigate, design and install new building mounted LED lighting with PIR activation to illuminate new footpath.
Info:
|
Duration: |
3 Weeks |
|
Client: |
VIVO Defence Services |
|
Value: |
£41,000.00 |
Innovation:
A key innovation within the project was the introduction of a fully permeable footpath construction designed to improve surface water management and reduce standing water issues. The permeable pavement build-up, incorporating Type 3 sub-base, open graded asphalt, and resin bound surfacing, enabled natural drainage infiltration while delivering a high-quality pedestrian finish.