Full Retention Separator & MTFI Facility
Work included:
Empty, clean, de-gas, foam fill and decommission four number existing underground fuel tanks. • Installation of 69,000lt Class 1 Full Retention Separator, set within 15x5x5m sheet pile cofferdam, concrete surround and venting.
Demolition & removal of existing fuel dispensers and control building
Manholes, Catch Pits with Non-Return Valves and Drainage Pipework
Utility Works Including Cable Diversions and the installation of new power and telecommunications cables
Asphalt hardstanding resurfacing repairs
New Thermoplastic Line Markings
Replacement fuel resistant jointing to existing concrete hardstand area
Installation of a 50,000ltr Above Ground twin fuel Enclosed Double-Bunded Compartment Fuel Storage Tank
Automated Fuel Dispensing System
1063lt Above Ground Enclosed Bunded Waste Oil Tank with connections.
Open Box Beam Safety Barriers
New Modular Building to house storage tank control and telecommunications furniture
Info:
Dates: |
2016 - 2017 |
Client: |
CarillionAmey |
Value: |
£310,000.00 |
Innovation:
Decommission of existing underground fuel tanks and install new above ground fuel and waste oil tanks. Includes the installation of a full retention separator and associated drainage system. Underground connections for existing waste oil collection and pumping system.
Customer Satisfaction:
"I'm fully satisfied with Benchmarks service & workmanship. We will be looking to them for future projects."
CA Project Manager