Memoral Wall Design & Installation 

Work included: 

Excavate & pour concrete foundations. 
Build 2no. ‘wing-walls’ in concrete block. 
Top off block walls with PCC copings. 
Bond brick slips to block walls (front, side & rear). 
Render a central section at the front of each wall, to fix future memorial plaques. 
Construct a French drain to rear of walls. 
Installation of electrical furniture, such as ducting and service chambers. 
Installation of uplighting fixtures. 
Cabling & electrical connection works. 
Soft Landscaping. 
Reinstatement of PCC slab surfaces around newly constructed structure. 

Info: 

Duration: 
4 Weeks 
Client: 
VIVO Defence Services 
Value: 
£30,000.00 

Innovation: 

Design & Build project based on client ‘rough’ Scope of Works. 
Consideration and carefulness about working around a pond, with the BPM SHEF unit. 