Work included:
Excavate & pour concrete foundations.
Build 2no. ‘wing-walls’ in concrete block.
Top off block walls with PCC copings.
Bond brick slips to block walls (front, side & rear).
Render a central section at the front of each wall, to fix future memorial plaques.
Construct a French drain to rear of walls.
Installation of electrical furniture, such as ducting and service chambers.
Installation of uplighting fixtures.
Cabling & electrical connection works.
Soft Landscaping.
Reinstatement of PCC slab surfaces around newly constructed structure.
Info:
Duration: |
4 Weeks |
Client: |
VIVO Defence Services |
Value: |
£30,000.00 |
Innovation:
Design & Build project based on client ‘rough’ Scope of Works.
Consideration and carefulness about working around a pond, with the BPM SHEF unit.