Airfield Aerodrome Manoeuvring Area (AMA) Signage & Line Marking. 

Work included: 

A secondary BPM survey & report on the signage around the airfield. 
Consultation with SATCO (Senior Air Traffic Control Officer) to ascertain the new requirement & wording of signage. 
Production of Airfield Plan with proposed AMA signage and Line Marking. 
Remove existing non-compliant signage & steel posts in various surfaces. 
Remove existing high-level sign plates fixed to the side of buildings. 
Install new root fixed, frangible steel posts & new sign plates. 
Install new sign plates to the side of various buildings. 
Removal of non-compliant AMA line markings and the installation of new ‘red’ epoxide paint markings. 

Info: 

Duration: 
3 Months 
Client: 
VIVO Defence Services 
Value: 
£77,000.00 

Innovation: 

Close liaison with The Navy’s SATCO to carefully consider all aspects of the new bespoke, but compliant AMA infrastructure. 

 Download The PDF 

Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings