Airfield Aerodrome Manoeuvring Area (AMA) Signage & Line Marking.
Work included:
A secondary BPM survey & report on the signage around the airfield.
Consultation with SATCO (Senior Air Traffic Control Officer) to ascertain the new requirement & wording of signage.
Production of Airfield Plan with proposed AMA signage and Line Marking.
Remove existing non-compliant signage & steel posts in various surfaces.
Remove existing high-level sign plates fixed to the side of buildings.
Install new root fixed, frangible steel posts & new sign plates.
Install new sign plates to the side of various buildings.
Removal of non-compliant AMA line markings and the installation of new ‘red’ epoxide paint markings.
Info:
Duration: |
3 Months |
Client: |
VIVO Defence Services |
Value: |
£77,000.00 |
Innovation:
Close liaison with The Navy’s SATCO to carefully consider all aspects of the new bespoke, but compliant AMA infrastructure.