Airfield Aerodrome Manoeuvring Area (AMA) Signage & Line Marking. 

Work included: 

A secondary BPM survey & report on the signage around the airfield. 
Consultation with SATCO (Senior Air Traffic Control Officer) to ascertain the new requirement & wording of signage. 
Production of Airfield Plan with proposed AMA signage and Line Marking. 
Remove existing non-compliant signage & steel posts in various surfaces. 
Remove existing high-level sign plates fixed to the side of buildings. 
Install new root fixed, frangible steel posts & new sign plates. 
Install new sign plates to the side of various buildings. 
Removal of non-compliant AMA line markings and the installation of new ‘red’ epoxide paint markings. 

Info: 

Duration: 
3 Months 
Client: 
VIVO Defence Services 
Value: 
£77,000.00 

Innovation: 

Close liaison with The Navy’s SATCO to carefully consider all aspects of the new bespoke, but compliant AMA infrastructure. 

 Download The PDF