
Carriageway & Concrete Repairs
Work included:
Saw Cutting
Cold Milling with a 1.0m Planer & Bob-Cat Planer
Machine Lay & Hand Lay Surfacing
Protection of Existing Services
Concrete Repairs & Reinstatements
Joint Sealant & Over Banding
Thermoplastic Line Markings
Info:
Duration: |
4Weeks |
Client: |
Amey Defence Services Ltd |
Value: |
£110,000.00 |
Innovation:
• Undertake Carriageway Condition Survey to establish Maintenance Programme.
• Foam-fill concrete within service chambers to prevent future settlement.
• Use of Premix Concrete with Reinforcing Fibres.
• Use of Industrial 10mm SMA with a PSV65.
Download The PDF



